Free Account Opening + AMC Free Demat
Loading...

BCPL Railway Infrastructure BRIL IPO vs Veeram Infra Engineering IPO

Comparision between BCPL Railway Infrastructure BRIL IPO and Veeram Infra Engineering IPO.

IPO Details

BCPL Railway Infrastructure BRIL IPO is a SME Fixed Price Issue IPO proposed to list at BSE SME while Veeram Infra Engineering IPO is a SME Fixed Price Issue proposed to list at BSE SME.

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
Logo BCPL Railway Infrastructure BRIL IPO Logo Veeram Infra Engineering IPO Logo
Issue Category SME SME
Issue Type IPO IPO
Process Type Fixed Price Issue Fixed Price Issue
Listing At BSE SME BSE SME
Lead Managers Gretex Corporate Services Limited First Overseas Capital Limited
Registrar Bigshare Services Pvt Ltd Kfin Technologies Limited
Market Maker
DRHP DRHP DRHP
RHP RHP RHP
Anchor Investor
IPO Allotment URL

Issue Size and Price

The total issue size of BCPL Railway Infrastructure BRIL IPO is up to ₹17.01 Cr whereas the issue size of the Veeram Infra Engineering IPO is up to ₹10.74 Cr. The final issue price of BCPL Railway Infrastructure BRIL IPO is ₹35.00 per share and of Veeram Infra Engineering IPO is ₹51.00 per share.

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
Face Value ₹10 per share ₹10 per share
Issue Price (Lower)
Issue Price (Upper)
Issue Price (Final) ₹35.00 per share ₹51.00 per share
Discount (Retail)
Discount (Employee)
Market Lot Size 4000 shares 2000 shares
Fresh Issue Size
Fresh Issue Size (Amount)
OFS Issue Size
OFS Issue Size (Amount)
Issue Size Total 48,60,000 shares 21,06,000 shares
Issue Size Total (Amount) up to ₹17.01 Cr up to ₹10.74 Cr

IPO Timetable

BCPL Railway Infrastructure BRIL IPO opens on Oct 05, 2018, while Veeram Infra Engineering IPO opens on Sep 28, 2018. The closing date of BCPL Railway Infrastructure BRIL IPO and Veeram Infra Engineering IPO is Oct 19, 2018, and Oct 12, 2018, respectively.

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
Anchor Bid Date
Issue Open Oct 05, 2018 Sep 28, 2018
Issue Close Oct 19, 2018 Oct 12, 2018
Basis Of Allotment (Tentative)
Initiation of Refunds (Tentative)
Credit of Share (Tentative)
Listing date (Tentative)
Anchor Lockin End date 1
Anchor Lockin End date 2

Financials

BCPL Railway Infrastructure BRIL IPO P/E ratio is , as compared to Veeram Infra Engineering IPO P/E ratio of .

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
Financial
Summary of financial Information (Restated)
Particulars For the year/period ended (in Rs. Lakhs)
31-Mar-18 31-Mar-17 31-Mar-16 31-Mar-15 31-Mar-14
Total Assets 5,148.71 4,837.37 5,205.26 4,821.54 4,330.37
Total Revenue 5,063.59 3,498.76 2,573.92 5,552.78 3,208.67
Profit After Tax 404.55 127.20 96.11 326.91 206.83
Summary of financial Information (Restated)
Particulars For the year/period ended (in Rs. Lakhs)
31-Mar-18 31-Mar-17 31-Mar-16 31-Mar-15 31-Mar-14
Total Assets 935.06 25.99 25.57 24.66 24.16
Total Revenue 1,281.50 3.95 2.94 3.88 3.55
Profit After Tax 67.07 0.02 0.01 0.01 0.02
Promoter Shareholding (Pre-Issue)
Promoter Shareholding (Post-Issue)
P/E Ratio
Market Cap
ROE
ROCE
Debt/Equity
EPS
RoNW

Shares Offered

In the BCPL Railway Infrastructure BRIL IPO retail investors (RII) are offered 23,04,000 shares while in Veeram Infra Engineering IPO retail investors are offered 23,04,000 shares. Qualified institutional buyers (QIB) are offered in BCPL Railway Infrastructure BRIL IPO and in Veeram Infra Engineering IPO.

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
Anchor Investor Reserveration
Market Maker Reserveration 2,52,000 shares 1,10,000 shares
QIB
NII 23,04,000 shares 9,98,000 shares
RII 23,04,000 shares 9,98,000 shares
Employee
Others
Total 46,08,000 shares 19,96,000 shares

Bids Received (Subscription)

BCPL Railway Infrastructure BRIL IPO subscribed 1.32x in total, whereas Veeram Infra Engineering IPO subscribed 1.19x.

  BCPL Railway Infrastructure BRIL IPO Veeram Infra Engineering IPO
QIB (times)
NII (times) 2.16x 1.62x
Big NII (times)
Small NII (times)
RII (times) 0.48x 0.75x
Employee (times)
Other (times)
Total (times) 1.32x 1.19x

Comments

Add a public comment...